ADVERTISEMENT for 2025 LMIG STREET RESURFACING
ADDENDUM No. 1
The City of Pine Lake 425 Allgood Road, Pine Lake, Georgia 30072 - 2025 LMIG Street Resurfacing Project is hereby revised as instructed throughout attached ADDENDUM No. 1.
This Addendum forms a part of the contract documents and modifies the original bid documents. The following items list below shall take precedence over the originally published bid documents for the above-named project and shall become a part of the contract documents.
Questions shall be emailed to neddagenhard@pinelakega.net Attention: Pine Lake City LMIG SERVICES 2025. Questions will be received by Thursday, June 26, 2025, at 2:00 pm. Responses will be made through an addendum posted on the City’s website. Respondents shall provide email addresses on facsimile and/or at time of package request and/or pick up. Submittals will be opened for review on Thursday July 3, 2025 @ 2:00 pm.
3. |
25 |
TN. |
4” RECYCLED ASPHALTIC CONC. PATCH-19.0 MM SUPERPAVE INCL. BITUMINOUS MATERIAL
|
$ |
$ |
4. |
6500 |
TN |
1.5” RECYCLED ASPHALTIC CONC. - 12.5 MM SUPERPAVE INCL. BITUMINOUS MATERIAL |
$ |
$ |
5. |
25
|
TN
|
4” RECYCLED ASPHALTIC CONC. LEVELING INCL. BITUMINOUS MATERIAL |
$ |
$ |
6. |
80000 |
L.F. |
4’ MIN. WIDTH EDGE MILLING, 1.5” DEPTH @ EDGE OF PAVEMENT, FEATHERED TO 0” (INCLUDES REMOVAL OF ANY PAVEMENT INSIDE THE GUTTER AT DRIVEWAYS |
$ |
$ |
Do you have what it takes?